PROJECT
The project included design of a greenfield 200 MMSCFD UOP Russel Cryogenic Plant and Gas Facility in Nigeria.
SOLUTION
The balance of Plant equipment includes: Slug Catcher, Three Phase separations, TEG Dehydration System, two (2) 5,000 BPD NGL Stabilizer Skids with two (2) 8 MMSCFD Stabilizer Booster Compressors, Five (5) 48 MMSCFD Residue Gas Compressors, three (3) 18 MMSCFD Refrigerant Compressors, two (2) 5,000 BBL NGL Storage Tanks, NGL Pipeline Pump Skid, With onsite power distribution (three (3) gas powered generators, one (1) backup diesel generator with storage tank), and utility equipment (instrument air system, fuel gas system, Flares, Fire Water System, Facility PDC/MCC Building).
RESULTS
The project is onging. When it's complete, the project will provide natural gas solutions for the country of Nigeria.
Similar Projects
Let's Connect
KLJ is recognized as one of the nation’s Top 500 Design Firms by Engineering News Record. Since 1938, KLJ has delivered innovative and practical problem-solving solutions for local, regional and national infrastructure projects. The rankings are evidence of a rich 75-year history, a thriving presence and a strong future. Let’s chat on how we can put our years of experience to use for you. Give us a call at 1-800-213-3860 or fill out the form below:
Reimagine your Career
What began as a small, family firm has evolved into a dynamic leader in engineering excellence. We seek creative, smart, and ambitious professionals who step outside the box and make a difference, every day. From recent college graduates to experts with more than 40 years experience, KLJ attracts professionals from around the world.